CHALLENGE

Our clients had lived in the suspended dwelling for years with the hope of one day acquiring the larger building next door and knocking through. Their idea was to turn two properties into three flats. The work involved to meet the required standards for fire and acoustic values was going to add too much weight to the original floor joists so we had to strip the building back to a shell and starting from the basement up with new floors and walls.

Working with the clients and their architect along the way several changes were made to the layout ensuring the building still complied with Building Regulations. Additional work carried out included fitting new fascia boards and guttering, renovating the facade of the property and renovating and altering of the clients original property once they moved into the main building.

The finished product has made the most out of the available space and the clients are more than happy with the final result.

“Cannot recommend the 4K Construction team highly enough. The quality of workmanship is the very best. This was our first sizeable project to which their guidance proved invaluable. In fact we would have found ourselves out of our depth without them. They also produce creative ideas for the space which has transformed our build and made life much more practical. Everyone who sees the transformation speaks very highly. Thanks guys – you’ve done us proud.”
– Paul and Liz

CUSTOMER

House conversion, Pentewan (Multi-phase project) flat conversion, bespoke office design, complete outside renovation designed to cater for wheelchair access, bespoke bookcase

What we did

Renovation/ Carpentry / General Build / Internal Work